On the day of our showcase, we had every file prepared and jsut needed to map our visuals to our signs. It proved to be difficult to map exactly to our signs as we had to tilt the projector onto an angle with a cardboard slip so it would cover every sign but with a little team work between me and Jay, we were able to successful map everyones pieces. Thankfully, at no point did the installation break or fall apart.
I enjoyed working as a team to create a piece that was unique and had its own personal take on the inital project.
Leave a Reply